Measures
The collection of measures for nature-based solutions for bank protection provides an overview of the measures already implemented in the estuarine waterways.
All individual measures can also be found in the following database, including the fact sheet with the respective boundary conditions of the measure.
To narrow down the measures displayed, please use our filter options:
- Filter
Filter options
- Estuary
- Waterway
- Bank protection
- Type of measures
- Institution
Ästuar
- Eider
- Elbe
- Ems
- Weser
Wasserstraße
- Bützflether Süderelbe
- Delme
- Dortmund-Ems-Kanal
- Elbe
- Ems
- Este
- Hahnöfer Nebenelbe
- Hunte
- Lühe
- Oste
- Pinnau
- Ruthenstrom
- Schwarztonnensander Nebenelbe
- Schwinge
- Unterweser
- Wümme
Uferschutz
- Direct bank protection
- Indirect bank protection
- Further bank protection
Maßnahmentyp
- Dead wood measure
- Live material measure
- Technical measure
- Further measure
Institution
- WSA Elbe-Nordsee
- WSA Ems-Nordsee
- WSA Weser-Jade-Nordsee
-
Unterweser
-
Estuary Weser Kilometre 23.500-24.900 left bank Implementation period unknown Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood training wall made of hardwood fascines tied to stakes on the Warflether Sand
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 23.500-24.900 left bank Implementation period unknown Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood groynes made of hardwood fascines tied to stakes on the Warflether Sand
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 25.000-25.500 left bank Implementation period unknown Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood training wall made of hardwood fascines on the Juliusplate
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 25.000-25.500 left bank Implementation period unknown Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood groyne made of hardwood fascines tied to stakes on the Juliusplate
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 27.850 right bank Implementation period 2020 Bank protection Direct bank protection Type of measures Dead wood measure
Brushwood box to damp a creek running along the revetment
Purpose of measures Tidal creek damping Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 28.500-31.400 left bank Implementation period unknown Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood groyne made of hardwood fascines tied to stakes on the Elsflether Sand
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 28.500-31.400 left bank Implementation period 2016/2017 Bank protection Direct bank protection Type of measures Dead wood measure
Willow brush mattress made of hardwood fascines tied to stakes for bank protection
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 32.750 left bank Implementation period 2015 Bank protection Direct bank protection Type of measures Dead wood measure
Dead wood brush mattress made of hardwood fascines tied to stakes at the lock entrance
Purpose of measures Bank protection and sand trap Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 33.100-33.250 left bank Implementation period unknown Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood groynes made of hardwood fascines tied to stakes on the Weser dike
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 33.300-34.250 right bank Implementation period unknown Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood groynes made of hardwood fascines tied to stakes near Harriersand
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 36.500-36.600 left bank Implementation period unknown Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood training wall made of hardwood fascines tied to stakes on the Käseburger Siel
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 38.100-38.200 left bank Implementation period 2013 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood training wall made of hardwood fascines tied to stakes on the Schierlohstrand
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 39.875-40.620 right bank Implementation period 2000 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood training wall made of tied pile rows adjacent to a sheet pile wall near Harriersand
Purpose of measures Reduction of water motion Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 42.400 right bank Implementation period 2008 Bank protection Direct bank protection Type of measures Dead wood measure
Brushwood box for creek damping. On the landward side of the damping reeds have developed; rushes are colonising in front of the brushwood box.
Purpose of measures Bank protection and reduction of water motion Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 43.100-44.100 right bank Implementation period 1950 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood training wall made of fascines tied to stakes near Sandstedt
Purpose of measures Ensuring and controlling of sluice drainage Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 43.125-44.050 right bank Implementation period ~1987 and 1994 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood groynes acting as a silt trap on the northern tip of Harriersand to reduce local dredging volumes
Purpose of measures Reduction of dredging volumes Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 43.300-44.125 left bank Implementation period ~1995 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood training wall made of 4 tied pile rows
Purpose of measures Bank stabilisation and tidal flat sedimentation Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 44.250-44.500 right bank Implementation period ~1985/~1993 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood groynes and pile groynes with a brushwood head
Purpose of measures Beach protection Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 44.500-44.800 left bank Implementation period ~1990-2020 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood training wall to improve water supply to the Upper Schweiburg
Purpose of measures Water supply and tidal flat stabilisation Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 46.625 right bank Implementation period ~2000-2005 Bank protection Direct bank protection Type of measures Dead wood measure
Brushwood box system to protect the groyne root
Purpose of measures Groyne protection Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 47.580-47.875 right bank Implementation period 1994 Bank protection Indirect bank protection Type of measures Dead wood measure, Technical measure
Combined structure of a brushwood box training wall with a riprap toe protection near Königsbalje
Purpose of measures Reduction of water motion Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 48.150 right bank Implementation period ~2008 Bank protection Direct bank protection Type of measures Dead wood measure
Brushwood mattress made of 4 tied pile rows acting as a deflector for creek damping
Purpose of measures Groyne protection Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 48.500-50.380 left bank Implementation period ~2010-2018 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood training wall made of 4 tied pile rows (built in 6 construction phases) to stabilise tidal flats
Purpose of measures Tidal flat stabilisation Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 49.125-50.070 right bank Implementation period 1992-1998 Bank protection Direct bank protection Type of measures Dead wood measure, Technical measure
Combined structure of a brushwood box and armour stone riprap
Purpose of measures Repair of erosion damage Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 50.380-51.640 left bank Implementation period ~1987 and 1995 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood and stone training wall acting as silt trap at the tip of the Strohhauser Plate island
Purpose of measures Reduction of dredging volumes Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 50.380-51.640 left bank Implementation period 1995 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood groynes adjacent to a traning wall at Strohauser Plate
Purpose of measures Reduction of dredging volumes Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 50.380 left bank Implementation period ~1993 Bank protection Direct bank protection Type of measures Dead wood measure
Longitudinal brushwood mattress structure acting as creek damping to protect the bank and groyne and support reed growth and tidal flat sedimentation
Purpose of measures Bank and groyne protection Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 52.350 left bank Implementation period ~1999 Bank protection Direct bank protection Type of measures Dead wood measure
Creek damping made of a brushwood box to stabilise the banks and groyne and to support tidal flat sedimentation and reed growth
Purpose of measures Bank and groyne protection Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 53.500 left bank Implementation period ~1991 Bank protection Direct bank protection Type of measures Dead wood measure, Technical measure
Bank protection made of brushwood boxes with riprap cover at the former ferry pier of Kleinensiel
Purpose of measures Bank protection Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 54.600-54.850 left bank Implementation period 2018 Bank protection Direct bank protection Type of measures Dead wood measure
Brushwood box to protect an erosion edge on the site of the compensation measure Kleinensieler Plate
Purpose of measures Bank protection Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 56.100-56.500 left bank Implementation period ~1996 Bank protection Indirect bank protection Type of measures Technical measure
Longitudinal riprap structure to support reed and ruderal area development
Purpose of measures Bank protection Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 58.400-58.875 right bank Implementation period ~2003 Bank protection Direct bank protection Type of measures Dead wood measure, Technical measure
Combined structure of a brushwood box and a riprap layer, both covered in silt
Purpose of measures Bank protection Contact persons WSA Weser-Jade-Nordsee
Rainer Hauerken
rainer.hauerken@wsv.bund.deFact sheet Download
-
-
Wümme
-
Estuary Weser Kilometre 5.150-5.200 right bank Implementation period Winter 2014/2015 Bank protection Direct bank protection Type of measures Dead wood measure
Brushwood box training wall securing a breach in a bend to maintain the natural river course
Purpose of measures Protection of a breach Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 16.180-16.240 right bank Implementation period Winter 2013/2014 Bank protection Direct bank protection Type of measures Dead wood measure, Live material measure
Brushwood box made of hardwood fascines and pile wall made of timber poles. Backfilling up to the level of the reed behind the brushwood box plus minor initial planting of reeds.
Purpose of measures Bank protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 17.000-17.080 right bank Implementation period Winter 2013/2014 Bank protection Direct bank protection Type of measures Dead wood measure
Brush mattress made of hardwood fascines tied to stakes
Purpose of measures Embankment toe and bank protection Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 17.310-17.390 left bank Implementation period Winter 2013/2014 Bank protection Direct bank protection Type of measures Dead wood measure, Live material measure
Combined structure of brushwood box (hardwood fascines) and brush mattresses tied to stakes. Backfilling up to the level of the reed behind the brushwood box and minor initial planting of reeds.
Purpose of measures Embankment toe and bank protection, scour repair Contact persons WSA Weser-Jade-Nordsee
Sven Wennekamp
sven.wennekamp@wsv.bund.deFact sheet Download
-
-
Elbe
-
Estuary Elbe Kilometre 642.300-642.700 left bank Implementation period 2018 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood boxes behind a riprap training wall on the Elbe island of Hanskalbsand
Purpose of measures Bank protection Contact persons WSA Elbe-Nordsee
John Appel
john.appel@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 642.300-642.700 left bank Implementation period 2017 Bank protection Direct bank protection Type of measures Live material measure
Living willow brush mattress and stakes for beach protection
Purpose of measures Bank protection Contact persons WSA Elbe-Nordsee
John Appel
john.appel@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 650.600-651.200 right bank Implementation period 2004 and 2012 Bank protection Direct bank protection Type of measures Technical measure
Lowering of 5 revetment sections near Hetlingen by 60-80cm to 10m each
Purpose of measures Encouraging estuarine bank dynamics Contact persons WSA Elbe-Nordsee
John Appel
john.appel@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 650.600-650.600 right bank Implementation period 2004 Bank protection Direct bank protection Type of measures Technical measure
Lowering of the revetment to allow estuarine bank dynamics
Purpose of measures Encouraging estuarine bank dynamics Contact persons WSA Elbe-Nordsee
John Appel
john.appel@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 661,800-662,500 right bank Implementation period planned for July/August 2023 Bank protection Indirect bank protection Type of measures Dead wood measure
Damping element for load reduction on the vegetation behind, consisting of four wired rows of piles filled with fascine material.
Purpose of measures Load reduction, encouraging reed development Contact persons WSA Elbe-Nordsee
Astrid Röder
astrid.roeder@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 703.150-703.515 left bank Implementation period 2003 Bank protection Direct bank protection Type of measures Dead wood measure
Brushwood boxes to protect the bank at the Hullen
Purpose of measures Bank protection under maintenance agreement Contact persons WSA Elbe-Nordsee
Peter Scholz
peter.scholz@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 709.780-709.800 left bank Implementation period 2011-2018 Bank protection Direct bank protection Type of measures Dead wood measure, Technical measure
Protection of the groyne root with brushwood boxes, reinforced with a riprap toe protection during stage 2 and completely overbuilt with riprap during stage 3
Purpose of measures Groyne protection Contact persons WSA Elbe-Nordsee
Peter Scholz
peter.scholz@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 712.460-712.580 left bank Implementation period 2017 Bank protection Direct bank protection Type of measures Dead wood measure
Rearward protection of the groyne root with brushwood boxes
Purpose of measures Groyne protection Contact persons WSA Elbe-Nordsee
Peter Scholz
peter.scholz@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 712.460-712.580 left bank Implementation period 2017 Bank protection Direct bank protection Type of measures Dead wood measure
Rearward protection of the groyne root with brushwood mattresses
Purpose of measures Groyne protection Contact persons WSA Elbe-Nordsee
Peter Scholz
peter.scholz@wsv.bund.deFact sheet Download
-
-
Ems
-
Estuary Ems Kilometre 27.200-27.400 left bank Implementation period August 2015 Bank protection Direct bank protection Type of measures Technical measure
Protection of the erosion edge with rock rolls
Purpose of measures Remediation of tidal marsh erosion identified during 2014 embankment inspection Contact persons WSA Ems-Nordsee
Friedhelm Roeloffzen
friedhelm.roeloffzen@wsv.bund.deFact sheet Download
-
-
Dortmund-Ems-Kanal (DEK)
-
Estuary Ems Kilometre 218.300-219.800 right bank Implementation period 2010-2016 Bank protection Direct bank protection Type of measures Dead wood measure
Several sections with brushwood boxes
Purpose of measures Repair of erosion damage Contact persons WSA Ems-Nordsee
Hans Hermann Schmitz
hans-hermann.schmitz@wsv.bund.deFact sheet Download
-
-
Pinnau
-
Estuary Elbe Kilometre 6.750-7.000 left bank Implementation period 29 May - 4 July 2018 Bank protection Direct bank protection Type of measures Dead wood measure
Bank maintenance of dikes without foreland (Schardeiche) with brushwood mattresses made of willow fascines from the preceding pruning season, arranged in a cross pattern
Purpose of measures Embankment protection Contact persons WSA Elbe-Nordsee
Caroline Feldmann
caroline.feldmann@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 7.340-7.500 left bank Implementation period Mai-June 2020 Bank protection Direct bank protection Type of measures Dead wood measure, Technical measure
Position stability of the revetment is ensured by fascine enclosure, rapid silting
and growth of the new reed vegetation, rooting encouraged by coir mesh matting.Purpose of measures Embankment protection Contact persons WSA Elbe-Nordsee
Caroline Feldmann
caroline.feldmann@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 7.500-8.080 right bank Implementation period Calendar week 7, 2019 Bank protection Direct bank protection Type of measures Technical measure
In order to rectify scour damage and bank collapses at dikes without foreland (Schardeiche), the embankment was reprofiled with slumped soil material (cohesive, densely rooted). Reed vegetation recolonised quickly and is to be further encouraged by future initial plantings.
Purpose of measures Embankment protection Contact persons WSA Elbe-Nordsee
Caroline Feldmann
caroline.feldmann@wsv.bund.deFact sheet Download
-
-
Delme
-
Estuary Weser Kilometre 0.000-0.500 left bank Implementation period 2005 Bank protection Direct bank protection Type of measures Dead wood measure, Technical measure
Embankment protection of a dike without foreland (Schardeich) by means of a riprap toe protection capped with willow brush mattresses made of willow cuttings
Purpose of measures Embankment protection Contact persons WSA Weser-Jade-Nordsee
Friedrich Hauptmann
friedrich.hauptmann@wsv.bund.deFact sheet Download -
Estuary Weser Kilometre 0.000-0.500 right bank Implementation period 2010 Bank protection Direct bank protection Type of measures Dead wood measure, Technical measure
Embankment protection of a dike without foreland (Schardeich) by means of a riprap toe protection capped with willow brush mattresses made of willow cuttings
Purpose of measures Embankment protection Contact persons WSA Weser-Jade-Nordsee
Friedrich Hauptmann
friedrich.hauptmann@wsv.bund.deFact sheet Download
-
-
Hahnöfer Nebenelbe
-
Estuary Elbe Kilometre 6.700-6.900 right bank Implementation period 2005-2008; 2015-2017 Bank protection Direct bank protection Type of measures Dead wood measure, Live material measure
Protection of several sections on the Elbe island of Hanskalbsand with willow brush mattresses and brushwood rolls
Purpose of measures Bank protection Contact persons WSA Elbe-Nordsee
John Appel
john.appel@wsv.bund.deFact sheet Download
-
-
Lühe
-
Estuary Elbe Kilometre 8.345-8.700 left bank Implementation period Spring 2012 Bank protection Direct bank protection Type of measures Dead wood measure, Live material measure, Technical measure
Combination of technical (stone mattresses) and planting (grass mattresses) measures for bank protection. In some sections pile walls were installed to protect the embankment toe.
Purpose of measures Repair of embankment damage Contact persons WSA Elbe-Nordsee
Caroline Feldmann
caroline.feldmann@wsv.bund.deFact sheet Download
-
-
Hunte
-
Estuary Weser Kilometre 11.900-12.000 right bank Implementation period 2018 Bank protection Direct bank protection, Indirect bank protection Type of measures Dead wood measure, Technical measure
Longitudinal brushwood box structure made of 2 tied pile rows with a secondary armour stone protection structure placed in front of it
Purpose of measures Repair of erosion damage, compensation measure Hunte expansion Contact persons WSA Weser-Jade-Nordsee
Dieter Höffmann
Dieter.hoeffmann@wsv.bund.deFact sheet Download
-
-
Bützflether Süderelbe
-
Estuary Elbe Kilometre 2.350-2.380 left bank Implementation period 2019 Bank protection Direct bank protection Type of measures Dead wood measure
Toe protection consisting of a pile wall made of driven spruce piles plus soil backfill and reed cover
Purpose of measures Remediation of bank collapse caused by wash and wake Contact persons WSA Elbe-Nordsee
Christopher Edler
christopher.edler@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 2.410-2.550 right bank Implementation period 2015 Bank protection Direct bank protection Type of measures Dead wood measure
Toe protection consisting of a pile wall made of driven spruce piles plus stone mattresses
Purpose of measures Remediation of bank collapse caused by wash and wake Contact persons WSA Elbe-Nordsee
Christopher Edler
christopher.edler@wsv.bund.deFact sheet Download
-
-
Este
-
Estuary Elbe Kilometre 7.030-7.090 right bank Implementation period 2018 Bank protection Direct bank protection Type of measures Dead wood measure
Spruce pile wall made of horizontal round timber piles with a soil backfill and natural vegetation
Purpose of measures Remediation of bank collapse caused by wash and wake Contact persons WSA Elbe-Nordsee
Christopher Edler
christopher.edler@wsv.bund.deFact sheet Download
-
-
Ruthenstrom
-
Estuary Elbe Kilometre 5.220-5.350 left bank Implementation period 2018 Bank protection Direct bank protection Type of measures Dead wood measure
Brushwood box with willow fascines to protect bank from further collapse
Purpose of measures Remediation of bank collapse caused by wash and wake Contact persons WSA Elbe-Nordsee
Christopher Edler
christopher.edler@wsv.bund.deFact sheet Download
-
-
Schwinge
-
Estuary Elbe Kilometre 0.470-0.560 right bank Implementation period 2015 Bank protection Direct bank protection Type of measures Dead wood measure, Technical measure
Toe protection consisting of a pile wall made of driven spruce piles plus riprap and natural vegetation
Purpose of measures Remediation of bank collapse caused by wash and wake Contact persons WSA Elbe-Nordsee
Christopher Edler
christopher.edler@wsv.bund.deFact sheet Download
-
-
Schwarztonnensander Nebenelbe
-
Estuary Elbe Kilometre 0,3-0,9 left bank Implementation period 2020 Bank protection Further bank protection Type of measures Further measure
Removal of about 640 m of revetment and four partially deteriorated groynes as well as shoreline flattening.
Purpose of measures Encouraging estuarine bank dynamics, shallow water areas and tidal flat and reed development Contact persons WSA Elbe-Nordsee
Astrid Röder
astrid.roeder@wsv.bund.deFact sheet Download
-
-
Oste
-
Estuary Elbe Kilometre 73.140-73.375 left bank Implementation period September 2011 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood box scheme between Belum’s groynes no. 9 and no. 11. In certain sections missing fascines were replaced by coir fascines. Some fascines go lost in the area every year due to storm tides and floating ice.
Purpose of measures Bank protection Contact persons WSA Elbe-Nordsee
Peter Scholz
peter.scholz@wsv.bund.deFact sheet Download -
Estuary Elbe Kilometre 73.375-73.610 left bank Implementation period June 2013 Bank protection Indirect bank protection Type of measures Dead wood measure
Brushwood box scheme between Belum’s groynes no. 7 and no. 9. In certain sections missing fascines were replaced by coir fascines. Some fascines go lost in the area every year due to storm tides and floating ice.
Purpose of measures Bank protection Contact persons WSA Elbe-Nordsee
Peter Scholz
peter.scholz@wsv.bund.deFact sheet Download
-